Shoutout to the old hand at the Gary job who caught my tube sheet before I welded it | Boilermakers - Freelance Forum - The Community for Independent Professionals
Shoutout to the old hand at the Gary job who caught my tube sheet before I welded it
Was fitting up a tube sheet on a small package boiler over in Gary last Tuesday and had the whole thing tacked and ready to burn in. An old hand from the other crew walked by, looked at my gap for about two seconds, and said the crown sheet was gonna pull way past tolerance once the heat hit it. Sure enough he was right, my gap was reading 1/8 tight on the bottom row. I cut the tacks, shimmed it back to where it should have been, and the stress crack never showed up on the hydro test. How do you all check for pull before you commit to a fit up, do you just eyeball it or use a gauge?
That line about the crown sheet pulling past tolerance once the heat hit it is the part that gets me. In my experience a lot of guys just eyeball it and call it good, but on a small package boiler the pull can sneak up on you fast. Do you figure the 1/8 tight was from the tacks alone, or was the sheet already moving before you even started fitting? I'm curious how you'd check a bottom row like that without burning a bunch of time on it.