Why does nobody talk about frozen mortar mixing water?
Hit a batch last month in El Paso that set up in 12 minutes because my water jug sat in the truck overnight, took me 3 days of ruined mud to figure out the temp was the problem. Anyone else keep their mixing water inside during winter, or am I just slow on this one?