That foreman in Omaha told me my joints were too fat, he was right
I was laying a retaining wall out by the interstate and this old foreman walks over, watches me for a minute, then says my mortar joints were eating up more material than the blocks. He showed me how to keep them at a tight 3/8 inch by using a gauge rod instead of eyeballing it, and I cut my waste by almost half on that job. Has anyone else had a boss or inspector point out something that felt picky but ended up saving you money?