Last Tuesday alone I had a slab in Austin spiderweb before I even got the float on it, then the pump truck showed up with an empty hopper because a dispatcher in Dallas mixed up two job sites, and by Friday I was patching the same driveway three times while the homeowner kept asking if the color was supposed to be that light, so has anyone else had a run where you just laugh to keep from throwing your trowel?