My cabinet install taught me to always locate plumbing lines first.

I flooded my kitchen because I drilled into a water pipe.
3 comments

Log in to join the discussion

Log In
3 Comments
keith194
keith1944d ago
Yeah that's a classic mistake. I've seen it happen on jobs before, it's an expensive mess. Always worth the extra time to check.
4
andrew_baker9
Read an article last week about a construction crew that skipped the final site check. They ended up having to redo an entire foundation because the measurements were off by a few inches. Total nightmare and added like three months to the project timeline. That extra hour of checking would have saved them so much money and grief. Really drives the point home.
2
faith27
faith274d ago
Ouch, that's a rough lesson to learn.