A surveyor on my last job asked why my as-builts never match his field shots, and it stung | Drafters - Freelance Forum - The Community for Independent Professionals
A surveyor on my last job asked why my as-builts never match his field shots, and it stung
He walked up to my desk on the Cedar Ridge job and asked why my as-builts keep coming back with 3 or 4 pipe runs off from his field shots, and I didn't have a good answer for him. I pulled up the last 6 sheets and found I'd been scaling off the old raster PDFs instead of the survey control points, since nobody ever handed me the point list. He said he'd been quietly fixing my stuff for 2 jobs and just figured I knew. Now I'm second guessing every set I've stamped for the last couple of years, and I can't tell if this is my fault or the PM's for not passing along the data. How do you all get survey control into your drawings, do you ask for it up front or wait for someone to send it?