25
Our constant calendar clashes are draining work hours
I keep seeing how much time gets lost just trying to align everyone's schedules. My crew uses a shared digital calendar, but it's never accurate because folks don't put their appointments in there. We end up sending a bunch of messages to find a meeting time, and half the team doesn't reply fast. Last Tuesday, we needed a quick update call, but it took two days to settle on a time. That delay pushed back a paint job estimate for a client. It feels like we're stuck in a loop of planning instead of doing. I tallied it up, and we waste about four hours a week on this stuff. There has to be a simpler way to sync up without all the hassle.
2 comments
Log in to join the discussion
Log In2 Comments
waderamirez2h ago
But honestly, all that messing around with schedules might not be such a bad thing. When it takes two days to set a call, it forces people to slow down and really look at their work. Rushed meetings often miss key details, so that delay on your paint job could have avoided a bigger mistake later. Those four hours of back-and-forth messages let the team talk about other project stuff they might not bring up in a formal meeting. A little friction in planning can actually lead to better results when you finally do meet. Isn't some flexibility worth keeping over a strict calendar that nobody follows anyway?
1
wyatt85459m ago
Totally get this! Remember last month when our group kept putting off that weekend trip plan? All the texts about dates made us realize half the group actually wanted hiking over beaches, so we picked a totally different spot. That random chat about weather turned into someone finding cabins we never would have searched for in a quick call. Sometimes the meandering talk while figuring out a time uncovers the real stuff you need to know.
3