I was checking out a job site in north Phoenix last Tuesday. Builder had the AC off for three days in July. The OSB subfloor was literally spongy in some spots. I took a moisture meter and got readings over 20 percent. Told the GC I wouldn't lay anything until it dried out and got tested again. He tried to push me to start anyway. Have any of you walked off a job over wet subfloor?
3 comments

Log in to join the discussion

Log In
3 Comments
finleym37
finleym377d ago
Read an article from the Journal of Light Construction where they tested OSB at 18% moisture and it swelled 12% after laying tile. You're smart to hold the line on that job. Builder's insurance won't care about his schedule when the floor fails in six months.
7
ray613
ray6137d ago
Jumped on that JLC article myself when it came out - crazy numbers, right? That 12% swell is basically a death sentence for any floor, but especially tile where the grout can't flex even a little. The builder's push back makes me wonder if he's got subs lined up back to back and can't afford a delay, or if he's just one of those guys who thinks everything is fine until it's not. You dodged a bullet standing your ground - in Phoenix heat especially, that moisture isn't going anywhere fast without AC running 24/7. Sticky situation for sure, but cheaper than ripping it all out in six months (like the article said).
2
the_olivia
Stood my ground on a wet slab in Mesa last spring and the homeowner tried to guilt me about their kid's birthday party. Told them I'd rather be the jerk with a delayed party than the guy explaining why their new kitchen floor was buckling before the cake was even cut. Managed to get the AC cranking for a week and it still took two more days of testing before I felt good about it. Sometimes being the bearer of bad news is just cheaper than being the one with the warranty claim.