Ran into an old tube sheet that took me 3 full days to drill out
I had this job last month at a power plant outside of Gary, Indiana that should've been a two day pull. We hit a tube sheet that must have been original from the 1970s, that alloy steel was way harder than anything modern. My carbide tipped drills were smoking after 20 holes, had to switch to an annular cutter setup which I hardly ever use. Took me 72 hours of straight labor for what I quoted at 12. Anyone else hit a wall like that where the material just fights back way harder than expected?